After six methods for stopping the leak failed, BP is now trying a seventh method: "cut and cap." Underwater robots are attempting to trim the pipe connected to the blowout preventer -- and depending on how well the cut is made, either a "top hat" or "top cap" will be lowered from the surface which would then transport the spewing oil to a drilling ship.'
Read more...
No comments:
Post a Comment
Thanks for your comment it is much appreciated.